Concept redesign preview for A.L. Vineyard Construction — not the company’s official website.
24-hour emergency structural shoring CSLB #709434-B · Veteran-owned (949) 360-1480
Shoring & repair

Emergency Shoring & Glulam Replacement

An existing glulam beam broke and had to be replaced. We installed temporary structural support and replaced the beam while the retail store remained open.

Completed
2019
Type
Commercial retail building repair
Client
Retail store
Location
To confirm

ResultStore stayed open throughout

Project scope

  • Temporary structural support
  • Broken glulam removed
  • New glulam beam installed
  • Store open during the work
  • CSLB #709434-BB – General Building
  • Avetta certifiedSupply-chain safety standards
  • Veteran-ownedUS Marine Corps
  • 24-hour emergency shoring(949) 360-1480
  • Since 1994Principal-led
24-hour emergency shoring

Cracked beam or sagging roof? Call any time.

Call with the property address, what has cracked, sagged or moved, and whether the building is occupied. If there is immediate danger to occupants, call 911 first.

Project results
24/7

Emergency shoring
Los Angeles & Orange County

More results from the field.

Open for business the same morning01 / 05
A popular restaurant suffered a broken roof beam. Our crew worked through the night to install emergency shoring, finishing at 3 a.m. — and the restaurant opened for business the same morning.
See the project
Emergency Roof Shoring & RepairCommercial retail building repair · August 2019
Store stayed open throughout02 / 05
An existing glulam beam broke and had to be replaced. We installed temporary structural support and replaced the beam while the retail store remained open.
See the project
Emergency Shoring & Glulam ReplacementCommercial retail building repair · 2019
Tenant kept in business03 / 05
The existing tower structure had failed. We removed the entire tower structure above the tenant and installed newly redesigned, larger structural members — all while keeping the tenant in business.
See the project
Chase Bank Octagon TowerCommercial retail center · October 2019
Production never stopped04 / 05
The owner wanted a steel roof-support column removed for better access. We shored the roof, poured new concrete footings, cut out the column and installed a newly designed steel beam to carry the roof load.
See the project
Searing IndustriesIndustrial building modification · January 2020
Higher-load roof + seismic strengthening05 / 05
A change of use called for a higher-capacity roof. We removed the roof framing, replaced it with new higher-load material and completed the building with new seismic strengthening.
See the project
Diamond Bar Shell BuildingCommercial CMU retail building · February 2020
Drag the card
Start a conversation

Let’s talk about your building.

Planned repair, inspection or a new framing package — tell us about the project and you’ll hear back from our principal. For an emergency, call any time.