24-hour emergency structural shoring CSLB #709434-B · Veteran-owned (949) 360-1480
New construction

New Ganahl Lumber Store

A new 60,000-square-foot retail store, with exposed glulam timber framing at the entrance and a timber roof structure.

Completed
2018
Type
New commercial retail building
Client
Ganahl Lumber
Location
To confirm

Result60,000 sq ft new retail store

Project scope

  • 60,000 sq ft retail store
  • Glulam timber entry structure
  • Timber roof framing
  • Crane-set beams
  • CSLB #709434-BB – General Building
  • Avetta certifiedSupply-chain safety standards
  • Veteran-ownedUS Marine Corps
  • 24-hour emergency shoring(949) 360-1480
  • Since 1994Principal-led
Commercial projects

Planning a similar build?

Send the project, location, scope and timeline — framing packages, tenant improvements, structural repairs or new commercial buildings.

Project results
24/7

Emergency shoring
Los Angeles & Orange County

More results from the field.

Open for business the same morning01 / 05
A popular restaurant suffered a broken roof beam. Our crew worked through the night to install emergency shoring, finishing at 3 a.m. — and the restaurant opened for business the same morning.
See the project
Emergency Roof Shoring & RepairCommercial retail building repair · August 2019
Store stayed open throughout02 / 05
An existing glulam beam broke and had to be replaced. We installed temporary structural support and replaced the beam while the retail store remained open.
See the project
Emergency Shoring & Glulam ReplacementCommercial retail building repair · 2019
Tenant kept in business03 / 05
The existing tower structure had failed. We removed the entire tower structure above the tenant and installed newly redesigned, larger structural members — all while keeping the tenant in business.
See the project
Chase Bank Octagon TowerCommercial retail center · October 2019
Production never stopped04 / 05
The owner wanted a steel roof-support column removed for better access. We shored the roof, poured new concrete footings, cut out the column and installed a newly designed steel beam to carry the roof load.
See the project
Searing IndustriesIndustrial building modification · January 2020
Higher-load roof + seismic strengthening05 / 05
A change of use called for a higher-capacity roof. We removed the roof framing, replaced it with new higher-load material and completed the building with new seismic strengthening.
See the project
Diamond Bar Shell BuildingCommercial CMU retail building · February 2020
Drag the card
Start a conversation

Let’s talk about your building.

Planned repair, inspection or a new framing package — tell us about the project and you’ll hear back from our principal. For an emergency, call any time.